FP: Task Added from To Do List Not Linked to PageLast reviewed: March 18, 1998Article ID: Q152388 |
The information in this article applies to:
SYMPTOMSThe FrontPage To Do List will not create a link to the current page in FrontPage Editor or in FrontPage Explorer when you use the Add button.
WORKAROUNDTo add a Task to the To Do List with a link to a specific page, use the following steps:
MORE INFORMATIONThis feature is desirable if you want to avoid a page link. For example, you might use this feature when you want to add a task that is not related to a specific page.
|
Additional query words: Front Page 1.10 97 98
© 1998 Microsoft Corporation. All rights reserved. Terms of Use. |