DOCUMENT:Q130426 21-MAY-2001 [schedplus] TITLE :Schedule+ Tasks: Duration and Estimated Effort PRODUCT :Microsoft Schedule+ for Windows PROD/VER:WINDOWS:7.0; Win95:7.0 OPER/SYS: KEYWORDS: ====================================================================== ------------------------------------------------------------------------------- The information in this article applies to: - Microsoft Schedule+ for Windows, version 7.0 ------------------------------------------------------------------------------- The Duration field on the To Do tab and the Estimated Effort field on the Status tab of the Task dialog box can appear to present the same information. The Duration field on the To Do tab represents the time between when the task starts and when it is finished. The Estimated Effort field on the Status tab of the Task dialog box represents how much work will actually be performed on the task. Additional query words: schedule plus 7.00 ====================================================================== Keywords : Technology : kbOfficeSearch kbSQLServ700 kbScheduleSearch kbOffice95Search kbZNotKeyword3 Version : WINDOWS:7.0; Win95:7.0 ============================================================================= THE INFORMATION PROVIDED IN THE MICROSOFT KNOWLEDGE BASE IS PROVIDED "AS IS" WITHOUT WARRANTY OF ANY KIND. MICROSOFT DISCLAIMS ALL WARRANTIES, EITHER EXPRESS OR IMPLIED, INCLUDING THE WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. IN NO EVENT SHALL MICROSOFT CORPORATION OR ITS SUPPLIERS BE LIABLE FOR ANY DAMAGES WHATSOEVER INCLUDING DIRECT, INDIRECT, INCIDENTAL, CONSEQUENTIAL, LOSS OF BUSINESS PROFITS OR SPECIAL DAMAGES, EVEN IF MICROSOFT CORPORATION OR ITS SUPPLIERS HAVE BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. SOME STATES DO NOT ALLOW THE EXCLUSION OR LIMITATION OF LIABILITY FOR CONSEQUENTIAL OR INCIDENTAL DAMAGES SO THE FOREGOING LIMITATION MAY NOT APPLY. Copyright Microsoft Corporation 2001.