XL5: Update Option Doesn't Change when Using Multiple LinksID: Q119438
|
In Microsoft Excel, if you change the Update option for multiple links selected in the Links dialog box, the option changes only for the last link in the selection.
This behavior is caused by a redraw problem in the Links dialog box, and does not affect the functionality of the link. For example, if you select three links in the Link dialog box, and you change the Update option to Manual, only the update option for the last link that you selected changes to Manual. However, the Update option actually does change to Manual for each of the links that you selected.
To refresh your screen when you change the Update option for a selection of
links in the Links dialog box, do either of the following:
Microsoft has confirmed this to be a problem in the Microsoft products
listed at the beginning of this article. This problem was corrected in a
later version of Microsoft Excel.
For more information about Updating A DDE Or OLE Link Manually, choose the Search button in Help and type:
links, remote
Additional query words: officeinterop refresh winppt macppt
Keywords : xlwin
Version : 5.00
Platform : WINDOWS
Issue type :
Last Reviewed: May 2, 1999