XADM: Exchange Server 5.5 Online Defrag Does Not Run During BackupID: Q183675
|
The online defragmentation schedule is controlled by the information store
(IS) maintenance schedule. If online defragmentation does not complete by
the end of the IS maintenance schedule, the current location is recorded
and the next online defragmentation begins at this point.
Exchange Server 5.5 online defragmentation does not run during a backup
session.
Due to a backup program running during the scheduled IS maintenance, it
is possible that the online defragmentation process will never complete.
For large message stores, ensure that IS maintenance gets at least 5
hours per night that do not overlap with the backup schedule in order
to finish its tasks.
Keywords : XADM
Version : WINDOWS:5.5
Platform : WINDOWS
Issue type : kbinfo
Last Reviewed: April 6, 1999