PRJ98: Project Stops Responding Saving Baseline or Interim PlanID: q174368
|
In Microsoft Project 98, if you save a baseline or interim plan when the "Actual costs are always calculated by Microsoft Project" option is turned off and Actual Work is entered on a non-working day, you will receive the following error message:
If you click Details, you receive an error message similar to the following:This program has performed an illegal operation and will be shut down. If the problem persists, contact the program vendor.
WINPROJ caused an invalid page fault in module WINPROJ.EXE at 0137:302b54dc.
NOTE: The Actual costs are always calculated by Microsoft Project option is located on the Calculation tab in the Options dialog box. (On the Tools menu, click Options.)An application error has occurred and an application error log is being generated.
Winproj.exe
Exception access violation (oxc0000005), address: ox3004290b
This error occurs when all of the following are true:
-and-
-and-
To prevent this problem if the conditions listed in the "Cause" section of
this article are true, do not save a baseline or interim plan if the
Actual costs are always calculated by Microsoft Project option is turned off.
To work around this problem select the Actual costs are always calculated by Microsoft Project option before you save your file. Note that if you use this work around, all actual costs that you have entered will be lost and Microsoft Project will calculate new costs.
Microsoft has confirmed this to be a problem in the versions of Microsoft
Project listed above.
This problem was corrected in Microsoft Project 98 for Windows, Service
Release 1 (SR-1).
For additional information about obtaining and installing SR-1, please see
the following article in the Microsoft Knowledge Base:
ARTICLE-ID: Q185102
TITLE : PRJ98: How to Obtain and Install MS Project 98 SR-1