ACC2000: How to Find Number of Working Days Between Two DatesID: Q210562
|
This article shows you how to calculate the number of working days between two dates.
Microsoft provides programming examples for illustration only, without warranty
either expressed or implied, including, but not limited to, the implied warranties of
merchantability and/or fitness for a particular purpose. This article assumes that you
are familiar with the programming language being demonstrated and the tools used to
create and debug procedures. Microsoft support professionals can help explain the functionality
of a particular procedure, but they will not modify these examples to provide added
functionality or construct procedures to meet your specific needs. If you have limited
programming experience, you may want to contact a Microsoft Certified Solution Provider
or the Microsoft fee-based consulting line at (800) 936-5200. For more information about
Microsoft Certified Solution Providers, please see the following page on the World Wide Web:
http://www.microsoft.com/mcsp/For more information about the support options available from Microsoft, please see the following page on the World Wide Web:
http://www.microsoft.com/support/supportnet/overview/overview.aspMicrosoft Access does not have a built-in function to determine the number of working days between two given dates. To determine this, you need to call a user-defined function. The following function includes the start date and the end date; so, the number of days between 02/02/99 and 02/03/99 equals one. Create a module and type the following line in the Declarations section if it is not already there:
Option Explicit
Type the following procedure:
Function Work_Days(BegDate As Variant, EndDate As Variant) As Integer
' Note that this function does not account for holidays.
Dim WholeWeeks As Variant
Dim DateCnt As Variant
Dim EndDays As Integer
BegDate = DateValue(BegDate)
EndDate = DateValue(EndDate)
WholeWeeks = DateDiff("w", BegDate, EndDate)
DateCnt = DateAdd("ww", WholeWeeks, BegDate)
EndDays = 0
Do While DateCnt < EndDate
If Format(DateCnt, "ddd") <> "Sun" And _
Format(DateCnt, "ddd") <> "Sat" Then
EndDays = EndDays + 1
End If
DateCnt = DateAdd("d", 1, DateCnt)
Loop
Work_Days = WholeWeeks * 5 + EndDays
End Function
To call the function, you can pass either a valid string or an actual date
value. The following are two ways to call this function from the Immediate
window:
?Work_Days("01/01/1996", "12/31/1999")
The date range above returns 1042.
?Work_Days(#03/05/1999#, #04/06/1999#)
The date range above returns 22.